Kuwait International Airport Passenger Terminal 2

Architectural and Engineering Design and Construction Supervision
Client

Ministry of Public Works

Services

Architectural and Engineering Design and Construction Supervision

Cost

KD 1.312 Billion

Data

Area
Building
Cars Parking
Passengers
:
:
:
:
504,257 m2
130,000 m2
4,500 Cars
13 million per annum

Status

Under Construction

Associate

Foster + Partners (UK)

Gulf Consult in association with Foster + Partners (UK) have been commissioned by the Ministry of Public Works on behalf of the Directorate General of Civil Aviation to undertake the Study, Design and Supervision of the New Passenger Terminal Building, Terminal 2, at Kuwait International Airport.

The New Passenger Terminal Building will significantly enhance the status of the airport as the gateway to the State of Kuwait.

Replacing the existing Terminal, this world class building will provide passenger capacity for 25 million passengers per annum.

The New Terminal Building components include:

  • Terminal Building with basement, ground plus two floors
  • Multi storey car parks with a minimum of 4,500 car spaces
  • Taxiways and Aprons adjacent to the Terminal
  • 28 Terminal Gates, including 8 Gates for Airbus A380
  • Transit Hotel with capacity for 400 beds
  • Shelters (Airside/ Landside)

Arup (UK), NACO (Netherlands) have been retained by the Association as specialist sub consultants.