X20 Bypass Road

Architectural/Engineering Design and Construction Supervision
Location

Tunisia

Client

Ministry of Equipment, Housing and Infrastructure, Republic of Tunisia

Services

Construction Supervision

Cost

US$. 35.5 million

Status

Completed 2021

Associate

None

With the objective to improve the quality of life for road users, and in particular road safety, the Ministry of Equipment, Housing and Infrastructure (Tunisia), commissioned Gulf Consult to execute the development works of the X20 Bypass.

Upon completion, the X20 bypass would provide a direct route between the Bizerte motorway and the Western motorway between the governorates of Ariana, Mannouba and Tunis, opening up the new urban centers of Greater Tunis (Cités Ennasr, El Menzeh, etc.)

The project constitutes the construction and implementation of:

  • 15 km urban expressway; 2 x 2 lanes expandable into 2 x 3 lanes
  • 11 bridges
  • 9 roundabouts
  • 32 box culverts
  • Rainwater Drainage System
  • Road signage and illumination
  • Landscaping
  • Relocation of infrastructure distribution networks